ServicesCommercial Roofing
Commercial Roofing in Henderson, NC
We repair and replace roofs on existing business buildings: storefronts, offices, churches and small warehouses. It starts with a free inspection and photos of what we found. Then we plan the work around your hours, so customers can still get in the door.

Roof work that keeps your business running
Most commercial roofs we see are low-slope. That means a membrane like TPO, EPDM or modified bitumen, or a metal panel roof. They fail differently than shingles. Seams open up, flashing pulls away from walls and water sits where it should drain.
A small leak on a flat roof can travel a long way before it shows up on a ceiling tile. By then the insulation under the membrane may be soaked. Catching it early is usually the difference between a repair and a new roof.
We treat your property like we would a house: entries kept clear, plantings and parking areas protected, and one person who keeps you posted. You will know what we are doing each day and when we will be done.

What our commercial roofing work covers
- 01
Membrane repairs
We patch and reseal TPO, EPDM and modified bitumen roofs. Open seams, punctures and worn spots get cleaned, primed and sealed with matching material.
- 02
Full roof replacement
When a roof is past saving, we tear off the old system, replace wet insulation and damaged decking, and install a new membrane or metal roof on your existing building.
- 03
Metal roof repair
Metal roofs loosen as they expand and contract. We replace backed-out fasteners, reseal seams and fix rusted panels before they let water through.
- 04
Flashing and penetrations
Most leaks start where the roof meets something else. We reflash parapet walls, rooftop unit curbs, vents and pipe boots.
- 05
Drains, scuppers and gutters
Water has to leave the roof fast. We clear and repair drains and scuppers, and our gutters work covers the edges that feed them.
Questions about Commercial Roofing?
Call(252) 579-0618Signs your commercial roof needs attention
Ponding that won't go away
A little water right after a storm is expected on a low-slope roof. When it is still there two days later, the extra weight and constant soaking break the membrane down early.
Brown rings on ceiling tiles
A stain on a drop ceiling means water has likely been coming in for some time. The actual opening on the roof is often a few feet away.
Bubbles, cracks or pulled edges
Blistered membrane, split seams and edges shrinking back from the walls all give water a path down to the insulation.
Backed-out screws and rusty laps
Long hot, humid summers make metal panels move, and fasteners work loose over time. Rust tends to start where panels overlap. Both are inexpensive to fix if caught early.
Trouble after high wind
Strong gusts can lift membrane edges and bend metal trim. After a bad storm, our storm damage repair crew can look it over and record what they find.
How a commercial roof job runs
- 1
Free inspection and photo report
We walk the roof and look at seams, flashing and drains, then check inside for stains. You get the photos and a straight answer on repair or replacement.
- 2
Written estimate and work dates
Every item is listed on paper. We set the work days and hours with you so staff, customers and deliveries know what to expect.
- 3
Setting up the site
Plantings get covered, the entrance stays open and the ground under the work is blocked off. We let staff or tenants know when the noisy days are coming.
- 4
One section at a time, closed up nightly
On a replacement we only strip what we can finish that day. Nothing is left open to the weather overnight.
- 5
Final cleanup and roof walk
Old material goes in the trailer, and we sweep the lot with a magnet to catch stray nails and screws. Then we walk the finished roof together and you get photos of the completed work.
What sets the price of a commercial roof
Every building is different, so we price the job only after we have walked the roof. You get the number in writing, line by line. The part nobody can see from the ground is what sits under the membrane, and that often decides the total.
- Square footage and edges
- Size counts, but so does the shape. Parapet walls, step-downs between roof levels and inside corners all need flashing, and each one adds labor.
- Type of roof system
- TPO, EPDM, modified bitumen and metal panels each carry their own material and labor costs. We walk you through the pros and cons for your building before you pick.
- Trapped water below the membrane
- We cut small core samples to see if the insulation is wet. Soaked boards have to be pulled and replaced, which adds both material and hours.
- Rooftop equipment and access
- HVAC units, vents and skylights each need their own flashing detail. A hard-to-reach roof or work scheduled outside normal hours takes longer.
- Permit and inspection
- Most replacements need a permit. We handle the paperwork and book the inspection, and the fee shows up on your estimate so it is not a surprise later.
Commercial roofing questions
Can you work while we are open for business?
Most of the time, yes. We schedule the loud tear-off for your slower hours, keep the front entrance clear and block off the ground under the work area. If some days are off limits, let us know early and we will build the schedule around them.
What credentials do you carry for work on a business building?
We are a licensed general contractor in North Carolina, and we are insured. If your landlord or property manager needs to see paperwork, we get it to them before the first day on the roof.
Should we repair the roof or replace it?
We look at two things: how much water has gotten into the insulation, and how tired the membrane is from edge to edge. If the boards underneath are mostly dry and the membrane still has life in it, fixing the problem spots makes more sense. You get the photos and core samples, so you can see why we landed where we did.
Will you help with the insurance claim after storm damage?
Yes. We photograph the damage, meet the adjuster on the roof and explain each step of the claim as it comes. The adjuster makes the call on coverage. Our part is making sure every damaged spot gets seen and written down.
How can we check your track record?
Start with the BBB, where we are an accredited business with an A+ rating. Once the job begins, every item is on paper and you get photos of your own roof, so nothing rests on our word alone.
How long does a commercial roof replacement take?
It depends on the size of the roof, the weather and what we find once the old layers come off. A small building can be done in a few days, and a larger one takes longer. Your schedule comes with the estimate, and if rain pushes a day back, we call and tell you.
Find out what your building's roof needs
We will inspect it for free and send you photos of what we find. You decide what happens next, with no pressure from us.